Site Information

Roadways & Public Areas

Site = 41ha @

410,000sq m

Less Buildings say 50%

(205,000)sq m

Less Asphalt

(34,800)sq m

Less Landscaped area

(5,000)sq m

165,200sq m concrete


Asphalt

Total Asphalt

= 34,800 sq meters

Repair 2½%

=870sq m

Note 2½% is very low expect min 5%

Rate for repair is small area 100mm thick = $105


Joint Sealing

Approx 4,000 concrete slabs on site

Joints to one slab = 27 lineal meters

This reduces with multiple adjoining slabs to 20 lineal meters.

4,000 @ say 20lm

= 80,000 L m

Rate $8 per lineal

=$640,000

Allowance of 25,000

=4% of site joints only very low considering the age and condition of joints

Note:

1 slab = 40.5m² @ $175 = $7,087 each to replace

Concrete Area: 5061 slabs

Avg 20mts per slab


Site Measurements of Asphalt

Existing Asphalt Paving

Heavy Duty

Light Duty

Carpark "V"

 

 

123m x 49

6,027

 

82 x 8

656

 

Carpark "F"

 

 

74 x 27

74 x 27

 

24 x 12

288

 

17 x 20

340

 

Carpark "H"

 

 

18 x 22

396

 

30 x 10av

300

 

F Canopies

 

 

70 x 34

 

2,380

31 x 16.7

 

517

Carpark "Y" South

 

 

59 x 56

3,304

 

28 x 19

532

 

20 x 56

1,120

 

28 x 64

1,792

 

11 x 129

1,419

 

Carpark "Y" North

 

 

78 x 49

3,822

 

32 x 7

224

 

Sydney Markets 2129 Offices

 

 

32 x 50

 

1,600

10 x 55

 

550

10 x 20

 

200

North Road

p

p

7.3 x 152

1,110

p

14 x 167

2,338

p

N/W Plaza Tenant Carpark

 

 

30 x 29.4

 

882

30 x 41

 

1,230

Plaza Tenant Carpark

 

 

19.3 x 48

 

927

6 x 48

 

288

14 x 40

 

560

 

 

 

 

25,666

9,143

 

34,800M3

p


Power Factors

Location

No of Units

Age

Plaza Sub

2

New 6/09

A

1

5 years

B

1

5 years

C

1

5 years

D

1

New 6/09

E

4

7 years

J

2

2008

N

2

New 2009

S

2

2008

U

2

Require Replacement

X

1

10 years

TOTAL

20

 


Building H

Partition Walls Aug 2004: REFER MAP


Building J

Partition Walls Aug 2004: REFER MAP


Building W

Temporary Banana Ripening Rooms
External Dimensions
8.300 wide x 31.8 long = 263.940 sq m
4 rooms = 65.985 sq m each room
Note: 4 x 40 pallet rooms = 160 pallets


Record of Coolroom in Building E

Tenancy No.

Tenant's Name

Type/Size of Rooms

No. Of Pallets

E1-4

LAMANA BANANAS

THERMFRESH ROOMS

382

E5-6

THE FRESH FRUIT CO.

10 X 9 PALLETS

90

E7-8

MORAITIS FRESH

THERMFRESH ROOMS

156

E9

WING CHONG

3 X 6 PALLETS, 2 X 9 PALLETS &

1 X 5 PALLETS

51

E10

WING CHONG

7X 6 PALLETS

42

E11

MORAITIS HOLDING

4 X 6 PALLETS, 3 X 9 PALLETS

51

E12

MORAITIS HOLDING

4 X 6 PALLETS, 3 X 9 PALLETS

51

E13-16

MORAITIS

THERMFRESH ROOMS

336

E17

SAM YICK

4 X 6 PALLETS, 2 X 9 PALLETS,
1 X 12 PALLETS

54

E18

SAM YICK

2 X 9 PALLETS, 4 X 6 PALLETS,
H12 PALLETS

54

E19

ARTHUR YEE

4 X 9 PALLETS, 2 X 6 PALLETS

48

E20

ARTHUR YEE

4 X 9 PALLETS , 1 X 12 PALLETS,
2 X 9 PALLETS

54

E21-22

ELECTRICAL SUBSTATION

 

 

E23

AUSNANA

3 X 6 PALLETS, 3 X 9 PALLETS

45

E24

AUSNANA

X 6 PALLETS, 3 X 9 PALLETS,
1 X 32 PALLETS

77

E25-28

AUSNANA

THERMFRESH ROOMS

334

E29

HFMB P/L

5 X 6 PALLETS

30

E30

HFMB P/L

5 X 6 PALLETS

30

E31-34

ARCELLA BANANAS

THERMFRESH ROOMS

296

E35

TROPIC BANANAS

5 X 6 PALLETS, 1 X 9 PALLET,
1 X 15 PALLETS

54

E36

TROPIC BANANAS

6 X 6 PALLETS, 1 X 15 PALLETS

51

E37

P.W. CHEW

5 X 6 PALLETS, 1 X 9 PALLETS

39

E38

P.W. CHEW

5 X 6 PALLETS, 1 X 9 PALLETS,
1 X 15 PALLETS

54

W1

TROPIC BANANAS

THERMFRESH ROOMS

40

W3

MORAITIS

THERMFRESH ROOMS

40

On seperate DX System

 

 

COLD STORE

MACRI

No 1 4A & 1A

0

COLD STORE

SINCLAIR & ANTICO

No 2 5A & 2A

0

COLD STORE

FRESHA PRODUCE

No 3 Rooms 3A, 3B, 3C & 6

0

 

 

 

TOTAL 2459


Lighting

Building D

Watt

Comments

Total

High Bay Lights

250W

 

242

Over Doorways

250W

 

18

Flower Markets

 

 

 

High Bay Lights

250W

 

123

Over Doorways

 

 

8

Building E

 

 

 

Awning Lights

250W

 

238

V Carpark

250W

 

108

Y Carpark

250W

 

74

ABC Canopies

 

 

 

Over Crossings AV,AB,BC,CY

400W

Replaced 1000W 1/10 with MH Wadco

30

High Bay Lights

250W

 

352

ABC

 

 

 

High Bay Lights

 

Buyers Walkways + Side Ramps

102

Over Doorways

250W

Replaced 5/09

24

P Canopy

 

 

 

High Bay Lights

250W

Replaced 8/09 Wadco

46

Total Lights

 

 

1365

Street Lights

 

 

 

Centre Road

250W

Installed 8/09

6

Other

 

 

434


Itemised Listing

Items

Numbers

Fully developed, either building, roads or parking areas for heavy loads.

42 HA

Buildings

52

Transformers

22

Building perimeter walls

5 km

Roof areas

Approx 200,000 m2 (20 ha)

Line marking for roads and stands

Approx 35 km

Emergency Lights

626

Exit Lights

719

Fire Hose Reel Pumps - Y, V, X, T

4

Hydrant Pump - Y & T

2

Dry Weather System

14 pumps in (7) pits

Thermostat Mixing Valves

2 x Sydney Markets 2129 Offices
1 x Flower Market

Gas Suspension Systems

 

Substations J, S, N, E, Main, D, S, X
Level 3 Comms room, Camera Room "B", MDF, PABX
Switchrooms - D & Comm's Hub

 

Electrical meters

 

General Supply
Load Smart
Sub Station

539
49
22

TOTAL

610

Switchboards

429

Switchboards SML

66

Plaza Level 3 replaced 09
Plaza Plant mechanical board replaced 09
Building D refurbished 09

 

Roller shutters

1,100

Hot Water Units

320

Fire Hydrant Valves

164

Fire Hose Reels

310

Portable Fire Extinguishers & Blankets

472

Phones on site, we manage all site cabling and 800 phones on SML PABX

2,000

Cool Rooms – 220 are maintained by tenants

390

Cooled space

200,000 Cubic Metres

Hand Basins

800+

Toilet Suites

450?

Stormwater Pits

350

Chillers- 2 new Powerpax installed 09

6 x 1,000 kW

Cooling Towers- Plaza (2) Replaced 11/09, Bldg E (3), Coldstores (2)

7

Substations - Main, X,J,T,E,D,U,S,N,pOTTS,A,B,C

13


Environmental Controls

Stormwater

1st flush system in which the first 5 mm of rain water containing solid waste from the roads and paving is collected in pits and pumped to sewer. Thereafter the water drains to stormwater canals.

The 350 stormwater pits on the site each have specially designed perforated plates which, pick up any solid waste over 5 mm diameter, but allows the stormwater to flow.

All stormwater pits are cleaned weekly.

The markets roads, pavings and all public areas are cleaned daily.

Cardboard and green waste is recycled.

Chillers

The number of R22 chillers has been reduced from 5 to 2.

Cooling Towers are tested monthly.

Lights

All external lights are controlled by PE Cells to turn off when there is sufficient natural light.

All internal High Bay Lights have set times controlled by a computer (BMS) to turn on and off at set times.

Half lighting is used at times of low activity.

Majority of power used is off peak.

All the above reduces power generating C02 gases.


Water

All public toilets hand basins have spring loaded timer taps set at approx 7 seconds.

These save considerable water.

Urinal cisterns are controlled by sensors not auto flushing.

Plumbers circulate around site to repair dripping taps and inspect site for signs of underground water leaks.

Liquid waste is pumped out monthly.


General

Special forklift wash bays have been erected to control and filter washing water through an oil plate separator then pumped to sewer.

All mechanical workshops have oil plate separators to retain oil and grease then water is pumped to sewer.

Stormwater and sewerage waste is tested, results sent to Sydney Water.


PABX Spare Cable Pairs

Public Toilets

Content coming soon.


Layout of Building E (larger)

Content coming soon.


Fitting & Fixtures Audit

Content coming soon.


Market Energy Survey Freelance

Content coming soon.


External Paint Colours

Base Walls generally Pre-cast Concrete panels

Off form concrete steel trowel finish

Metal wall sheeting above concrete panels

olorbond – Pale Eucalypt (Mist Green)

Metal awning sheeting

Colorbond – Cottage Green (Caulfield Green)

Metal awning framing, door frames, door and bollards

DULUX Paint colour FICUS P24.B9

Roller shutter doors

Colourbond – Pale Eucalypt (Mist Green)

Aluminium framed windows

Duratec colour APO GREY PCS15 32786 powder coating

Window louvres

Duratec colour C/B MIST GREEN 84221 powder coating

Metal roof cladding and accessories

Colourbond – Pale Eucalypt (Mist Green)

Downpipes

DULUX Paint colour BLUE EXPANSE P41.H8

Eaves gutters

Numbers

Power Factors

Content coming soon.


Building F Map

Content coming soon.